Some of our past projects
Project date: 2021
Water pipeline DN400 in Kranj
Construction of a DN400 water pipeline approximately 450m long.
Project date: 2022 / 2023
Water pipeline DN150 – DN400 in Murska Sobota
The project envisages the new construction of 26,215 m of transport pipelines, 90,823 m of primary pipelines and 83,512.2 m of secondary pipelines. The project foresees the new construction of 14 structures on the system and the upgrading of 33 existing pumping stations and 14 water storage tanks. The procurement is divided into three lots.
Project date: 2022 / 2023
Water pipeline DN80 – DN400 in Hubelj
The subject of the contract is the implementation of the project Comprehensive hydraulic balancing of the Hubelj Skuk water supply system, which includes: provision of adequate storage at the Hubelj Waterworks – construction of a water storage tank with a capacity of 3,000 m3; connection of the Hubelj system to the Gora system with a suitable pumping station for supply in both directions; connection of the Gora system to the Višnje and Podkraj-Strelice water supply systems, and provision of supply to new users.
Project date: 2020 / 2021
Water pipeline in Bohinjska Češnjica
The entire water supply network, including hydrants, has been upgraded. The project also included the bridging of the water mains, which includes thermal insulation of the pipes.
Project date: 2022
Bridge drainage at Ljubljana nord road ring
Bridge drainage is usually in polyester, but can also be in other materials, depending on the requirements of the project.
Project date: 2020 – 2023
SML drainage in Zelene Jarše
The project covers several residential buildings and several phases, during which we supplied SML materials.
Project date: 2018 – 2023
Water pipeline DN100 – DN150 in Kanal ob Soči
The project covers the development of the water supply network in several areas, such as Kanalski vrh, Kal nad Kanalom, Zavrh, Hoje, Testeni, Močila and in Kanal ob Soči itself.